275 bbl/d Condensate Stabilization Package (3 Phase)
Supporting Documents (22)
library_booksGA
                  Application Overview
                  Mechanical Flow - Condensate Stabilization Package
                  Layout / Assembly
                  Condensate Stabilizer Tower - External Inspection (September 2015)
                  Condensate Stabilizer Tower - U-1A
                  Condensate Stabilizer Tower - External Inspection (March 2018)
                  Condensate Stabilizer Tower - UT (2018)
                  Cooler - UT (2015)
                  Cooler - Data Sheet
                  Cooler - External Inspection (2018)
                  Cooler - UT
                  Feed Bottom Heat Exchanger - INFORM REPORT
                  Feed Bottom Heat Exchanger - External Inspection (March 2018)
                  Feed Bottom Heat Exchanger - UT
                  Stabilizer Feed Separator - UT (2015)
                  Stabilizer Feed Separator - UT
                  Stabilizer Feed Separator - Data Sheet
                  Stabilizer Feed Separator -  External Inspection (2018)
                  Stabilizer Feed Separator - UT
                  Stabilizer Reboiler - UT
                  Stabilizer Reboiler -  INFORM REPORT
                  
        Listing ID:
      
      
        ASSK-16439
    
          Published
        
      Notes:
The stabilizer is designed to handle 275 bbl/d (43.7 m3/d) of condensate at steady state when the plant is operating at 120 MMscfd (3400 E3m3/d). This includes a 10% contingency. The package has a minimum inlet flow of 137 bbl/d (21.9 m3 /d) of condensate. If thecondensate rate drops below this level the package will be operated in a batch mode until the minimum flow is reached again. The stabilizer tower can only be turned down to 2:1 and meet the guaranteed product spec from the vendor.
    Share item via
    
  














