275 bbl/d Condensate Stabilization Package (3 Phase)
Supporting Documents (22)
library_books
GA
Application Overview
Mechanical Flow - Condensate Stabilization Package
Layout / Assembly
Condensate Stabilizer Tower - External Inspection (September 2015)
Condensate Stabilizer Tower - U-1A
Condensate Stabilizer Tower - External Inspection (March 2018)
Condensate Stabilizer Tower - UT (2018)
Cooler - UT (2015)
Cooler - Data Sheet
Cooler - External Inspection (2018)
Cooler - UT
Feed Bottom Heat Exchanger - INFORM REPORT
Feed Bottom Heat Exchanger - External Inspection (March 2018)
Feed Bottom Heat Exchanger - UT
Stabilizer Feed Separator - UT (2015)
Stabilizer Feed Separator - UT
Stabilizer Feed Separator - Data Sheet
Stabilizer Feed Separator - External Inspection (2018)
Stabilizer Feed Separator - UT
Stabilizer Reboiler - UT
Stabilizer Reboiler - INFORM REPORT
file_download Download All in ZIP
Listing ID:
ASSK-16439
Published
Notes:
The stabilizer is designed to handle 275 bbl/d (43.7 m3/d) of condensate at steady state when the plant is operating at 120 MMscfd (3400 E3m3/d). This includes a 10% contingency. The package has a minimum inlet flow of 137 bbl/d (21.9 m3 /d) of condensate. If thecondensate rate drops below this level the package will be operated in a batch mode until the minimum flow is reached again. The stabilizer tower can only be turned down to 2:1 and meet the guaranteed product spec from the vendor.
Share item via