Please wait...

275 bbl/d Condensate Stabilization Package (3 Phase)


GA

Application Overview

Mechanical Flow - Condensate Stabilization Package

Layout / Assembly

Condensate Stabilizer Tower - External Inspection (September 2015)

Condensate Stabilizer Tower - U-1A

Condensate Stabilizer Tower - External Inspection (March 2018)

Condensate Stabilizer Tower - UT (2018)

Cooler - UT (2015)

Cooler - Data Sheet

Cooler - External Inspection (2018)

Cooler - UT

Feed Bottom Heat Exchanger - INFORM REPORT

Feed Bottom Heat Exchanger - External Inspection (March 2018)

Feed Bottom Heat Exchanger - UT

Stabilizer Feed Separator - UT (2015)

Stabilizer Feed Separator - UT

Stabilizer Feed Separator - Data Sheet

Stabilizer Feed Separator - External Inspection (2018)

Stabilizer Feed Separator - UT

Stabilizer Reboiler - UT

Stabilizer Reboiler - INFORM REPORT


file_download Download All in ZIP
Listing ID:
ASSK-16439
Published

Item Info
Misc Type:
Vessels
Misc Item Title:
275 bbl/d Condensate Stabilization Package
Listing Title additional text:
(3 Phase)
Year Built:
2009
Manufacturer:
ALCO
Pressure:
400 PSI
General Info
Service Type:
Sour
PASC Condition Rating:
B
Skidded:
Yes
Housed:
Yes
Connection Status:
Disconnected
Warranty:
No
Units Available:
1
Notes:

The stabilizer is designed to handle 275 bbl/d (43.7 m3/d) of condensate at steady state when the plant is operating at 120 MMscfd (3400 E3m3/d). This includes a 10% contingency. The package has a minimum inlet flow of 137 bbl/d (21.9 m3 /d) of condensate. If thecondensate rate drops below this level the package will be operated in a batch mode until the minimum flow is reached again. The stabilizer tower can only be turned down to 2:1 and meet the guaranteed product spec from the vendor.

Financial Info
Availability Status
Available
Location
Nearest Town / City
Dawson Creek
Province
BC
Country
Canada
Share item via